Premium Vertical Mobility · GCC

Standards we work to.

  • EN 81-20 — Safety rules for the construction and installation of lifts: passenger and goods passenger lifts.
  • EN 81-50 — Safety rules for the construction and installation of lifts: design rules, calculations, examinations and tests of lift components.
  • EN 81-41 — Special lifts for the transport of persons and goods — vertical lifting platforms intended for use by persons with impaired mobility.
  • EN 115-1 / EN 115-2 — Safety of escalators and moving walks.
  • ISO 9001 — Quality management system.
  • NFPA 70 (NEC) — National Electrical Code provisions applicable to elevator systems.
  • NFPA 72 — National Fire Alarm and Signaling Code provisions for elevator recall and fireman's service.
  • CE marking — components, where applicable.

Regional code authorities we routinely submit to.

Qatar

Qatar Civil Defence (QCDD) — full submittal preparation, technical clarifications, and inspection facilitation.

UAE

UAE Civil Defence (federal and emirate-level), with experience across Dubai, Abu Dhabi, and Sharjah authority regimes.

Saudi Arabia

Saudi Building Code (SBC), Civil Defence, and municipal authorities for projects in Riyadh, Jeddah, Dammam, and emerging mega-projects.

Kuwait, Bahrain, Oman

Local Civil Defence and municipal authorities. Full English-Arabic submittal documentation as required.

What's in a typical submittal package.

  • Code-compliance memo per elevator (EN 81-20/50 + local code).
  • Equipment data sheets, certifications, and test reports.
  • Shaft and machine-room drawings with civil-coordination notes.
  • Electrical single-line diagrams.
  • Safety-circuit logic and emergency operation documentation.
  • Fireman's service and earthquake-mode operation memos (where applicable).
  • Material test certificates, factory acceptance test reports.
  • Civil Defence inspection-day documentation pack.
FAQ

Compliance — common questions.

Yes. Our submittal team prepares the inspection-day documentation pack, our project manager attends the inspection, and our engineering desk responds to any inspector clarifications. The building owner does not need to attend.

We coordinate submittals across all GCC regulatory regimes from a single submittal team — ensuring consistency across Qatar QCDD, UAE Civil Defence, SBC, and other authority regimes.

Yes. Where the project envelope requires deviation or alternative compliance routes (common on bespoke architectural projects), our engineering desk prepares the alternative-compliance memo for authority approval.

Standard EN 81-20/50 submittal pack: 2 working weeks from receipt of project drawings. Complex bespoke configurations: 3–4 weeks.

Need compliance documentation for a project?

Send the project name and the authorities involved. Our submittal team responds within 48 hours with scope, timeline, and pricing.