Built for cargo, finished for the building it sits in.
Freight and service elevators on regional projects are often treated as commodity equipment — an afterthought to the passenger system. AuroLift treats them as core infrastructure: rated to handle continuous duty cycles, finished for back-of-house operational rigor, and engineered against the same code standards as our premium passenger systems.
Capabilities at a glance.
- Capacities from 1,000 to 5,000 kg, with bespoke configurations available for heavier loads.
- Reinforced cabin floors (steel plate or non-slip chequer), kick-resistant wall panels, stainless or galvanized finishes.
- Door configurations: centre-opening, side-opening, vertical bi-parting, and 2- or 4-panel telescopic for wide openings.
- Hospital-bed and stretcher-rated configurations with extended cabin lengths and silent-running door operators.
- Integration with dock-loading systems, material-handling equipment, and BMS scheduling.
- VVVF drives sized for continuous duty in 50°C ambient conditions.
- Anti-collision strips, full-height photocell sensors, and overload sensing per EN 81-20/50.
- Heavy-traffic AMC plans included from day one.
Typical use cases.
Industrial & logistics
Warehouse mezzanine handling, factory floor transfers, dock-side loading. Capacities to 5,000 kg with reinforced flooring for forklift entry where required.
Hospitality back-of-house
Room-service, linen, kitchen, and staff circulation — separated from guest passenger systems to protect the hospitality experience.
Healthcare
Bed elevators with stretcher-rated dimensions, silent door operators, and NFPA-compliant emergency operation. Redundant configurations standard on critical floors.
Retail & mall service
Tenant-fit-out delivery, refuse handling, anchor-store stock circulation — sized to the mall's heaviest tenant brief.
Process — from BoQ to commissioning.
- Brief. Share BoQ, drawings, or specification. We confirm capacity, door type, and code envelope within 24 hours.
- Proposal. Detailed BoQ, technical submittal, fixed pricing, and indicative delivery schedule.
- Manufacturing & submittal. Civil Defence submittal prepared in parallel with manufacturing.
- Installation & commissioning. Certified crews, load tests at 125% rated capacity, full safety-test documentation.
- Service. Heavy-traffic AMC kicks in at handover with monthly inspection cycles.